G Seven Agriculture Pvt. Ltd. successfully completed the Construction of 115 Greenhouse Tunnels in different wards of Mahankal Rural Municipality under a National Competitive Bidding (NCB) contract. The project was completed on time, delivering high-quality protected cultivation structures designed to promote commercial vegetable production and improve agricultural productivity.
This project was undertaken to support farmers by providing durable greenhouse tunnels that enable year-round cultivation under controlled growing conditions. Through the successful completion of this project, G Seven Agriculture contributed to strengthening protected agriculture practices and improving farming opportunities within Mahankal Rural Municipality.
· Client: Mahankal Rural Municipality
· Project: Construction of 115 Greenhouse Tunnels
· Location: Different Wards of Mahankal Rural Municipality
· Procurement Method: National Competitive Bidding (NCB)
· Number of Greenhouses: 115 Units
The project included the supply, construction, and installation of 115 greenhouse tunnels in accordance with the approved technical specifications. Each structure was carefully installed to ensure durability, structural stability, and suitability for commercial vegetable cultivation.
The work included site preparation, structural installation, covering installation, quality inspection, and final handover.
Each greenhouse tunnel was constructed using quality materials to ensure long-term performance and reliable crop protection.
Key Specifications:
· Greenhouse Size: 5 m × 12 m
· Structure Type: MS Pipe Dome House
· Greenhouse Cover: 100 Micron UV-Stabilized Plastic
· Insect Protection: 40 Mesh Insect Net
· Total Units Installed: 115
These specifications were selected to provide adequate ventilation, crop protection, and an improved growing environment suitable for protected agriculture.
The construction work was carried out through systematic planning, material management, and on-site supervision. Every stage of the project was monitored to ensure compliance with the approved design and technical requirements.
Despite seasonal rainfall and occasional power interruptions during the construction period, the project team effectively managed site activities and maintained the quality of work through proper planning and coordination. The project was successfully completed within the contractual requirements.
The successful completion of 115 greenhouse tunnels provides farmers with improved facilities for protected cultivation, helping reduce weather-related production risks while supporting higher-quality crop production. The project also contributes to promoting modern agricultural practices and sustainable farming in the region.
G Seven Agriculture Pvt. Ltd. remains committed to delivering high-quality agricultural infrastructure through professional engineering, quality construction, and timely project execution. With experience in greenhouse construction, irrigation systems, and modern agricultural solutions, the company continues to support government agencies, development organizations, cooperatives, and private farmers in advancing sustainable agriculture throughout Nepal.